Tuesday, November 24, 2026

The Supplier Gets Paid. What Does the Client Get?

A tilted balance scale weighs a software supplier surrounded by cash against a client with empty pockets and a half-built system.

If I went into a showroom to buy a car, I’d expect to pick a model and then choose the colour, the alloy wheels and whether I wanted leather seats. I’d expect the heater, the windscreen wipers and the boot catch to have been sorted out long before I walked in.

Buying a new software system can feel like walking into that showroom and being shown a pile of nuts and bolts and some sheets of steel. You’re told the supplier can build you any car you like. Then you start paying consultancy rates while everyone works out how to make the doors shut.

How much of this has been done before?

I remember a company I worked for deciding to move to a big enterprise system. We seemed to have consultants permanently on site, configuring it to do the things the company needed. What struck me at the time was how ordinary a lot of those needs were. Other companies doing similar work would have needed much the same things. Yet there didn’t seem to be much from those previous implementations that we could start with.

I still see versions of that today. The supplier brings in a platform that can be configured for all sorts of purposes. That sounds attractive. Then you find out how much time it takes to turn that flexibility into a system that does one particular job well.

Every organisation will have a few things it does differently. What I’d like to know is how much of the work has genuinely never been done before. If a supplier has delivered this kind of system several times, I’d expect some of that experience to show up in what they can give the next client on day one. If it all has to be worked out again in workshops, who is getting the benefit of those previous projects?

The little things you miss on Monday morning

When a product has been built for a particular job and used by several organisations, it tends to pick up features along the way. Someone asks for a way to make the same change to twenty records at once. Someone else needs to correct a mistake without asking IT. An administrator wants to see who changed a setting and when. Those requests come from people who’ve had to use and manage the thing every day.

It’s easy to call these features bells and whistles when you’re deciding what can wait until a later release. Each one sounds small. Taken together, they’re a large part of what makes a system easy to live with.

The new system might get through a demo perfectly well. Then it goes live and people discover that jobs they used to do themselves now need a support ticket. A change that took five minutes takes half an hour. You can end up spending a lot of money replacing a system and still have staff asking when they’ll be able to do things they could do before.

Who carries the cost of finding out?

I can see why a supplier likes a highly configurable platform. It can use the same technology for a wide range of clients. I can also see why a client would pay good money for people who know the platform inside out and have already solved similar problems.

What bothers me is when the client pays those rates while its own staff spend hours in workshops teaching the supplier how the job works, and then pays again for the supplier to configure functions that a product built for that job would already have. The supplier has a big say in how many people are needed, how long discovery takes and which work gets done first. Every extra week comes out of the same budget the client is relying on to get a usable system.

As the money gets tight, there’s a strong temptation to build the bits that can be finished quickly and push the harder work into a later release. You can show progress every few weeks that way. You can also get to the end of the budget with a system that does the basics and still takes more effort to run than the one it replaced.

The supplier can be paid in full for the time it spent. The client has spent its budget, given up months of its own staff’s time and may still be waiting for the savings or improvements that justified the project. If it wants the missing functionality, it might have to buy more time from the same supplier.

That’s where I think the balance has tipped too far. Before I agreed to pay for the first workshop, I’d want to see how much of the car was already built. And I’d want to know who was paying for the rest if the money ran out before I could drive it home.

I’ve written before about how good it felt to get hands-on again. One thing I like about being close to the work is that you get to see which small changes actually make someone’s day easier. I’d like to see more software projects judged on that.

If you’ve been through a system replacement, I’d be interested to hear what it was like once the project team moved on. What became easier? And what did you find yourself missing from the old system?

If this sounds familiar, you can explore more of my writing on work and technology.